Peskobeton Etalon Stroy M-300, 25 kg

Brand: Etalon Stroy
Description: Pot life: 180 min., hardening time: 1 day, frost resistance, consumption of mixture layer 10 mm: 22 kg/m², minimum consumption of mixture layer 10 mm: 10 kg/m², water consumption per 1 kg: 0.14 l
Frost resistance: There is
Hardening time: 1 day
Solution pot life: 180 min.
Water consumption per 1 kg: 0.14 l
Mixture consumption layer 10 mm: 10 - 22 kg/m²